Project Tower Hill Lift Shaft

Lift shaft construction from platform to street level

The soft strip out and deconstruction of existing staircases, retaining walls and excavation of 300 tons of overburden to expose the ticket hall capping slab. Excavation of a lift pit at platform level and construction of a rising lift shaft and emergency exit stairwell and stairs from platform to street level. The street level scheme involved the creation of a new public circulation area and glass balustrade viewing platform. This was a particularly involved project as there were multiple stakeholders and defects were minimised by us ensuring that queries, changes and designs were communicated early to ensure that all parties had sufficient time to respond and offer input. This project was let as a design and build and our previous experience on similar contracts  enabled us to identify items and schemes at tender stage that would not be practical from a build or compliance perspective and these were identified and alternatives offered. Multiple stakeholders within a small site would require co-ordination and Spoor-tech ensured that a project engineer was based on site throughout the project to liaise with the client and London Underground.

2015

Year

£650,000

Overall Value

Cleshar / Balfour Beatty / Citizen M

Client

Andy Chojnacki

Contact

Headhouse and street lobby
Platform Level lift pit
Unit 12, Dolphin Point,
Dolphin Way, Purfleet, West Thurrock
Essex, 
RM19 1NR
Business Hours
Office and Admin
Monday - Friday: 9AM to 5PM
Support
Night Desk & emergencies - call 07951 289 994
Contact Details
Call
01708 866 633
Email
admin@spoortech.com
© Copyright 2024, SpoorTech Limited.